Sample data — a fictional job (99-100), scored by the real engine. Nothing here is yours.
Book a demoSample Campus — Building B
Job 99-100 · k12 · construction
In progressAugust 2026Month to date · day 19 of 31
Not checking the source.Not yet read from the source
Projection, falling: If nothing new is filed: 85.33 → 84.33 on Aug 24 · 1 rule loses older records · closes at 83.33 on Sep 6: −1 as 1 rule loses older records
why
On Aug 24, with nothing new filed:
- Weekly Corrective Actions: 10 of 10 pts → 5 of 10 pts
After that, by the close on Sep 6:
- Weekly Safety Meetings: 20 of 20 pts → 15 of 20 pts
Contracts is costing the most: −6.88 pts on the total.
In progress
August 2026 is still open. These figures are provisional: they move as evidence lands, and nothing is the record until the month is closed.
The score sheet
11 of 42 rules are below standard.
Tap a category for its score, what is costing it points, and every rule behind it. Worst first.
Categories, worst first · Month to date · day 19 of 31
- Site Specific Safety PlanSafety · Meeting standard
- Crew Work Plans / JHAsSafety · Below standard
- Weekly Safety MeetingsSafety · Meeting standard
- Morning HuddlesSafety · Meeting standard
- Monthly Super / PM Safety WalkSafety · Meeting standard
- Last Safety Report ScoreSafety · Below standard
- Avg. Time to Close Safety ObservationsSafety · Meeting standard
- Weekly Corrective ActionsSafety · Meeting standard
- Utility Locate TrackingSafety · Meeting standard
- Site Specific Quality PlanQuality · Meeting standard
- Pre-Installation MeetingsQuality · Meeting standard
- Quality Inspections (Checklists)Quality · Below standard
- Avg. Time to Close Quality ObservationsQuality · Meeting standard
- Quality Observation CountQuality · Meeting standard
- NPDES InspectionsQuality · Meeting standard
- Quality Action PlansQuality · Above standard
- Underbilled PositionFinancials · Meeting standard
- Outstanding Accounts ReceivableFinancials · Meeting standard
- Monthly Cost ForecastFinancials · Meeting standard
- Monthly Budget SnapshotFinancials · Meeting standard
- Gross Profit FadeFinancials · Below standard
- Gross Profit Fade — 3rd consecutive monthFinancials · Scored with nothing entered
Who enters it: Project Executive (Project Executive)
- Gross Profit LossFinancials · Meeting standard
- Profit % at RiskFinancials · Meeting standard
- Labor Costs vs. Schedule CompletionFinancials · Meeting standard
- Outstanding Sub Invoice ApprovalsFinancials · Below standard
- Write-Up OpportunityFinancials · Above standard
- Schedule Quality & Baseline ComparisonSchedule · Below standard
- Buyout Percent CompletionContracts · Critical
- Commitments Open Over 30 DaysContracts · Below standard
- Commitment Avg. TurnaroundContracts · Meeting standard
- Commitment CO Avg. TurnaroundContracts · Below standard
- Prime Contract CO Avg. TurnaroundContracts · Below standard
- Change Event to PCCO over 2 daysContracts · Below standard
- Project Startup Checklist Action PlanDocumentation · Meeting standard
- RFI TurnaroundDocumentation · Meeting standard
- Submittal TurnaroundDocumentation · Meeting standard
- Submittals Percent CompletedDocumentation · Meeting standard
- Meeting Minutes RecordedDocumentation · Meeting standard
- Daily Log CompletionDocumentation · Meeting standard
- Self-Perform Productivity TrackingDocumentation · Above standard
- On-Site Sub ComplianceContracts · Waiting on an entry
Who enters it: Assistant Project Manager (Assistant Project Manager)
Which jobs are at risk this month →
More about this month
The trend appears once two months are sealed.
Project to date
85.33The average of 1 month, each weighted the same: August 2026 so far, still live. It moves until this month closes.
- Averaged over 1 month scored under scorecard version 1; scored on 41 of 42 rules.
- 1 of 1 counted month was scored below full coverage.
- August 2026 · so far, live85.33scorecard version 1 ·41 of 42 rules scored · every category measured
- January 2026 is left out: the job started on January 15, 2026, partway through it.
- February 2026 is left out: it has ended without a record — still closing, never closed, or reopened.
- March 2026 is left out: it has ended without a record — still closing, never closed, or reopened.
- April 2026 is left out: it has ended without a record — still closing, never closed, or reopened.
- May 2026 is left out: it has ended without a record — still closing, never closed, or reopened.
- June 2026 is left out: it has ended without a record — still closing, never closed, or reopened.
- July 2026 is left out: it has ended without a record — still closing, never closed, or reopened.
126 records in August 2026 (192 counting earlier months the rules look back at) · newest dated August 28, 2026
What’s missing
Most expensive first — what closing each item is worth on the score, if the month ended today.
Schedule Quality & Baseline Comparison
+4.4 ptsschedule composite at 78 of 100 (period 2026-08)
Project Manager · Schedule · 78 of 100 pts
Buyout Percent Completion
+2.5 ptsbuyout percent at 71% vs 95% expected by month 7
Project Manager · Contracts · 0 of 20 pts · next tier +20 pts
Outstanding Sub Invoice Approvals
+2 pts1 sub invoice left unapproved deducting 10 points (period 2026-06 (2-month lag from 2026-08))
Assistant Project Manager · Financials
Change Event to PCCO over 2 days
+1.9 pts1 change event that took over 2 days to reach a PCCO deducting 15 points (period 2026-08)
Project Executive · Contracts
On-Site Sub Compliance
+1.4 ptsNo sub compliance pct figure recorded yet
Assistant Project Manager · Contracts · 0 of 20 pts · next tier +20 pts
Commitment CO Avg. Turnaround
+1.3 ptsAverage CCO duration is 15 days — get below 10 days for 20 points (period 2026-08)
Assistant Project Manager · Contracts · 10 of 20 pts · next tier +10 pts
Crew Work Plans / JHAs
+1 pts17 of 20 crew-days covered (85%) — 1 more needed to reach 90%
General Superintendent · Safety · 10 of 15 pts · next tier +5 pts
Commitments Open Over 30 Days
+0.6 pts1 of 20 commitments open past 30 days (5%) — 1 fewer needed to reach 3% or less
Assistant Project Manager · Contracts · 5 of 10 pts · next tier +5 pts
Prime Contract CO Avg. Turnaround
+0.6 ptsAverage PCCO duration is 40 days — get below 30 days for 20 points (period 2026-08)
Project Executive · Contracts · 15 of 20 pts · next tier +5 pts
Last Safety Report Score
+0.4 ptssafety report score at 87% in period 2026-08 (next tier at 90% for 10 pts)
Safety · Safety · 8 of 10 pts · next tier +2 pts
Quality Inspections (Checklists)
8 of 10 required inspections done (80%) — 1 more needed to reach 90%
QA/QC · Quality · 15 of 20 pts · next tier +5 pts
Who owes what
- a member with no address · Project Manager2 open items+6.9 pts
- a member with no address · Assistant Project Manager4 open items+5.3 pts
- a member with no address · Project Executive2 open items+2.5 pts
- a member with no address · General Superintendent1 open item+1 pts
- a member with no address · Safety1 open item+0.4 pts
- a member with no address · QA/QC1 open item—
Up to this many points each role could put back on the score.
Where these numbers come from
- 28Automatic Read from a connected platform automatically — nobody typed them.
- 12Entered by hand Entered by a named person and verified before it counts.
2 figures are still waiting on a person for August 2026.
See the figures →A rule moves to a connected platform on its own once a connected source sends its figure.
Learn more
Which metrics need a person is not a list somebody maintains: Rivynt asks the integration layer which evidence it produces, and whatever the rubric still needs beyond that is a figure a human supplies.
Computed live from 192 evidence records in Rivynt, against Reference Project Scorecard.
No score run has been recorded for this month yet.